Excavation Cost Estimator
Break an excavation project into measurable cost categories instead of relying on one rough number.
1. Measure the work
Start with the length, width, depth, and any overage or waste factor that applies. Separate excavation quantities from material quantities when the job involves both digging and importing material.
2. Account for hauling
Haul-off costs depend on the quantity removed, truck capacity, number of loads, haul price, and disposal arrangements. Actual costs vary by distance, material, truck, and disposal site.
3. Include labor and equipment
Labor and equipment can be entered as separate costs. This makes it easier to see whether a quote is missing operator time, machine time, or other job costs.
4. Include project time
DirtQuote's Project Time category lets you enter estimated hours and a time rate. The resulting time cost is included in the estimate and markup calculation.
5. Apply markup and review
After direct costs are entered, review the subtotal, markup, and total. Confirm your assumptions before sending the estimate.
More DirtQuote Resources
Calculate cubic yards, tons, and truckloads for excavation and material work.
Build a more complete estimate for dirt work and site preparation.
Estimate stone and gravel quantities and truckloads.
Understand the cost categories that go into an excavation estimate.
Learn how DirtQuote helps contractors create field-ready estimates.