Break an excavation project into measurable cost categories instead of relying on one rough number.

Open DirtQuote Estimator

1. Measure the work

Start with the length, width, depth, and any overage or waste factor that applies. Separate excavation quantities from material quantities when the job involves both digging and importing material.

2. Account for hauling

Haul-off costs depend on the quantity removed, truck capacity, number of loads, haul price, and disposal arrangements. Actual costs vary by distance, material, truck, and disposal site.

3. Include labor and equipment

Labor and equipment can be entered as separate costs. This makes it easier to see whether a quote is missing operator time, machine time, or other job costs.

4. Include project time

DirtQuote's Project Time category lets you enter estimated hours and a time rate. The resulting time cost is included in the estimate and markup calculation.

5. Apply markup and review

After direct costs are entered, review the subtotal, markup, and total. Confirm your assumptions before sending the estimate.

More DirtQuote Resources

Excavation Calculator

Calculate cubic yards, tons, and truckloads for excavation and material work.

Dirt Work Estimating

Build a more complete estimate for dirt work and site preparation.

Gravel & Stone Calculator

Estimate stone and gravel quantities and truckloads.

Excavation Cost Estimator

Understand the cost categories that go into an excavation estimate.

Contractor Estimating Software

Learn how DirtQuote helps contractors create field-ready estimates.